Key Details
Location:
Coquitlam, BC
General Contractor:
PCL Constructors Westcoast Ltd.
Date Project Finished:
Spring 2019
Services Provided:
Design-Build
Electrical Construction
Project Overview
Project Details
The project included the design and installation of a 1000kVA indoor unit substation, with a 600kW generator and two 80kVA uninterruptible power sources. We also managed the IMIT (Information Management/Information Technology), AV (Audio/Video), and security systems, as well as all life safety systems, which includes fire alarms, emergency lighting and exit signs. Upon completion of the electrical installation, BC Hydro approved to upgrade the capacity of the substation from 12.5kV to 25kV, to meet expected load growth. This required us to shut down and tap the double wound high voltage unit substation for 25kV.
Latest Projects
Langara College Science & Technology Building
Abbotsford Entertainment and Sports Centre
Done Right, Down To The Smallest Detail
Read more about some of the electrical construction installation projects we've completed
See ProjectsSince 1987